OEM aluminium boat building since 2014 — 40+ designs from 3 to 26 m, shipped worldwide

Contact

Tell us what the boat has to do.

Payload, draft, crew, the water at your slip and the sea you work in. Send that, and we will come back with a layout, a price and a build slot — usually within one working day.

This form opens your email app with the message ready to send. You can also write to [email protected] directly.

Before you write

How long does a boat take to build?

Ten to sixteen weeks from order to launch, depending on size and specification. Surveyed patrol and passenger boats take the longer end. We give you a launch date in writing before you pay a deposit.

What does the price include?

The hull, deck, console or cabin, fuel system, wiring, bilge and paint or mill finish. Outboards, electronics, trailers, survey and freight are quoted separately. We will price a complete package if you prefer one number.

Can you deliver outside China?

Yes. Boats go by road within China and to Asian ports, and by container or RoRo from Shanghai to the Gulf, Africa, Europe and the Americas. We build the cradle and handle the lashing; you handle import duty.

Can I see a boat before ordering?

Yes — there is usually a hull under construction in the shed, and we can arrange a sea trial on a customer boat nearby. Tell us the size you are considering so we can show you the closest match.

Do you build to survey?

Patrol, rescue and passenger hulls can be built to MCA workboat code, RINA or BV. We work with surveyors in Shanghai and can arrange a third-party inspection before the boat is crated, so you are not relying on our word alone.